Runway 5-23 Rehabilitation
Delta is underway with the design, bidding, and construction of this five phase Runway 5-23 Rehabilitation project at Morristown Municipal Airport, one of New York City’s reliever airports. The Airport is located just 27 miles from the Holland Tunnel, and serves significant and meaningful national and international business traffic. The need for minimizing operational impacts at this field cannot be understated.
Delta completed the preliminary engineering portion of the environmental assessment for this $65 million development program. A FONSI was received in April, 2015. Project elements include full width strengthening overlay and keel rehabilitation (nine inch deep mill of the runway center), installation of an asphalt overlay fabric, nine inches of P-401 SP asphalt, rehabilitation of the lateral safety areas to standards, reconstruction of the connector taxiways, realignment of taxiways to meet FAA standards, reconstruction of the Runway 23 MALSR system, rehabilitation of the airfield lighting system, installation of PAPIs for Runways 5 and 23, and regrading of the glide slope stabilization area.
The runway rehabilitation program was initially funded with 100% local funds, which speaks to the importance and extent of the Airport’s service to the New York City area. The phasing and sequencing of this major development program is critical to keeping the Airport open and operational. It is anticipated that the entire program will take 7-10 years.
Runway 6 Extension Program
During our long-term relationship with the Virginia Highlands Airport Authority, we have helped the Airport grow from a small general aviation airport with a few dozen airplanes, to a large facility with over 50 airplanes including corporate jets. In 2008, the Authority approached Delta for assistance with extending their runway to accommodate the growing corporate jet demand.
Delta has managed all phases of the runway extension project from the existing length of 4,471 feet to a future length of 5,500 feet. The initial steps included developing the justification to get FAA and Virginia Department of Aviation buy-in on the project’s purpose and need. Delta then completed the airport planning and environmental assessment necessary as first steps in all airport projects.
In order to move this project from a plan to a reality, Delta assisted the Authority with developing a creative funding program that combined funds from multiple sources to maximize governmental grants while reducing the local cost burden.
Delta’s knowledge of the various funding programs and ability to put together the applications and presentations for the funding agencies helped the Authority secure the funding commitments necessary to undertake the multi-million dollar runway extension project.
Delta has completed the planning, environmental, land acquisition, and engineering design projects for the runway extension, with the construction phases now underway. The project is phased to maximize federal and state grants, and minimize costs to the Authority. Completion of the runway extension is planned in the next few years.
Runway 21 Extension Program
The extension of Runway 21 at Charlottesville-Albemarle Airport followed the successful completion of the Master Plan Update and Environmental Assessment which identified and evaluated a runway extension of 800 feet to serve the growing regional jet airline service. Delta provided program management, design, bidding, and construction phase services to complete the runway and associated parallel taxiway extensions.
Many factors required that the project be completed in several phases to ultimately achieve 6,800 feet. Challenges accomplished during the multi-year, multi-project program included: locating material for the extensive fill that was necessary, extensive coordination with the airlines and FAA for maintaining the Airport’s existing approach minimums during the entire project, dealing with several environmentally sensitive issues which included water quality and wetland mitigation, and phasing the project into usable segments of work within annual budget limitations. The final phase of the runway extension program was substantially complete in 2014.