Runway 5-23 Rehabilitation
A continuation of a 15+ year pavement rehabilitation program, Delta completed the design and construction documents for the rehabilitation of Salisbury-Ocean City: Wicomico Regional Airport’s secondary runway, Runway 5-23. Consisting of pavements from its original 1940’s construction and various asphalt overlays, it was recognized early in the planning process that the best option for the long-term would be full reconstruction.
The design for the reconstruction of the 5,000-foot-long by 100-foot-wide runway included a review of pavement design options, reconstruction of the affected electrical systems to LED lighting, and a review of overall airport geometry to provide conformance with the FAA’s goal of minimizing runway incursions. To provide for bidding flexibility, Delta identified various key locations where projects could begin and end over the three-year programming period. Delta also identified unique components that could be included in each bid to maximize annual funding anticipated.
To reduce the overall project duration, the design was far enough along in September of 2013 that the FAA issued a partial construction grant of over $2 million using year-end recovery funds, a pleasant surprise to all parties involved. Recognizing an opportunity to complete the project, the FAA informed the Airport in December of 2013, that an additional $8 million was available to potentially fully fund the project in one bid cycle. Delta provided construction administrative assistance and full time resident project representation for this $9 million construction project which was completed in 2016.
Runway 6 Extension Program
During our long-term relationship with the Virginia Highlands Airport Authority, we have helped the Airport grow from a small general aviation airport with a few dozen airplanes, to a large facility with over 50 airplanes including corporate jets. In 2008, the Authority approached Delta for assistance with extending their runway to accommodate the growing corporate jet demand.
Delta has managed all phases of the runway extension project from the existing length of 4,471 feet to a future length of 5,500 feet. The initial steps included developing the justification to get FAA and Virginia Department of Aviation buy-in on the project’s purpose and need. Delta then completed the airport planning and environmental assessment necessary as first steps in all airport projects.
In order to move this project from a plan to a reality, Delta assisted the Authority with developing a creative funding program that combined funds from multiple sources to maximize governmental grants while reducing the local cost burden.
Delta’s knowledge of the various funding programs and ability to put together the applications and presentations for the funding agencies helped the Authority secure the funding commitments necessary to undertake the multi-million dollar runway extension project.
Delta has completed the planning, environmental, land acquisition, and engineering design projects for the runway extension, with the construction phases now underway. The project is phased to maximize federal and state grants, and minimize costs to the Authority. Completion of the runway extension is planned in the next few years.
Runway 21 Extension Program
The extension of Runway 21 at Charlottesville-Albemarle Airport followed the successful completion of the Master Plan Update and Environmental Assessment which identified and evaluated a runway extension of 800 feet to serve the growing regional jet airline service. Delta provided program management, design, bidding, and construction phase services to complete the runway and associated parallel taxiway extensions.
Many factors required that the project be completed in several phases to ultimately achieve 6,800 feet. Challenges accomplished during the multi-year, multi-project program included: locating material for the extensive fill that was necessary, extensive coordination with the airlines and FAA for maintaining the Airport’s existing approach minimums during the entire project, dealing with several environmentally sensitive issues which included water quality and wetland mitigation, and phasing the project into usable segments of work within annual budget limitations. The final phase of the runway extension program was substantially complete in 2014.